Basic Info.
After-sales Service
Engineers Available to Service Machinery Overseas
Voltage
220V / 380V / Customized
Composition
Water Treatment Equipment
Processing Material
Agronomic Products
Mixing Accuracy
Less Than 2%
Inlet Temperature of Chilled Water
0~4 Temperature
Inlet Pressure of Chilled Water
0.01~0.08MPa
Inlet Temperature of Syrup
2~8 Temperature
Inlet Pressure of Syrup
0.01~0.08 MPa
Inlet Pressure of CO2
0.6~0.38MPa
Purity of CO2
More Than 99.9%
Working Pressure of Storage Tank
0.2~0.5MPa
Overall Dimension
1100*950*2000mm
Transport Package
Plywood Case
Specification
around 300 kg
Origin
Zhangjiagang, China
Product Description
Gas Mixer Blending Tanks Mixing Tank Soft Drinks Mixer CO2 Mixing MachineProduct Description
This machine is mainly used for carbonation of various aerated beverages, such as lemon, cola, Sprite, juice, etc. It is the main equipment in the complete set of equipment for the production of aerated beverages.
The diameter of mixing tank is 400mm. The plate thickness is 3mm. And the plate, pipe and valve parts are all in 304 stainless steel.
Product Parameters
Production Capacity | 2 T/h |
Adjustment Range of Syrup Water Ratio | 1:3~1:10 |
Air Content | (CO2 : H2O) 3:2 |
Mixing Accuracy | <2% |
Inlet Temperature of Chilled Water | 0~4ºC |
Inlet Pressure of Chilled Water | 0.01~0.08Mpa (Consistent with syrup tank) |
Inlet Temperature of Syrup | 2~8ºC |
Inlet Pressure of Syrup | 0.01~0.08 Mpa (Consistent with chilled water) |
Inlet Pressure of CO2 | 0.6~0.38MPa |
Purity of CO2 | >99.9% |
Working Pressure of Storage Tank | 0.2~0.5MPa |
Power of Motor | 1.5KW(CDL4-80) |
Overall dimension (L*W*H) | 1100×950×2000mm |
Weight | Around 300kg |
After Sales Service
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$100/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation and 3 daily hot meals.
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Commercial Terms
1. Warranty
All parts are under two year warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
2. Payment
50% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
50% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
Detailed Photos
FAQ
Q1: How to get an appropriate offer from us?
A1: Please inform us:
1) production capacity per hour/per day/per month
2) filling liquid: water, juice, carbonated drink, beer or other
3) bottle type: plastic bottle, glass bottle, can or other
4) cap type: screw cap, crown cap, can lid or other
5) for water treatment, it's better to offer us the raw water quality report
Q2: What can I do if I haven't gotten any clue of the production line? I just want to open a factory and to do the business.
A2: Don't worry about this; You can inform us:
1) the exact production you want to deal with;
2) the budget of the production line. If there is no budget of the business, I will send you the popular machine in our factory for your ref;
3) we will help to design everything including the machine layout and factory layout;
Q3: Are you a trading company or a manufactory?
A3: We are manufacturer in Zhangjiagang city, two hours driving from Shanghai. We have more than 10 years' experience of offering turnkey solutions.
Q4: Why is your prices higher than others?
A4: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference. We can design the machines according to your requirements (material, power, filling type, container and so on). At the same time, we will give you professional suggestion from many years industrial experience.
Q5: What is your payment term?
A5: 50%T/T in advance as down payment, and the rest should be paid before shipping.
Q6: What's the delivery time?
A6: 30-45 days after the T/T deposit.
Q7: How to install my machines when it arrives? How much the cost?
A7: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q8: How long is the time for installation?
A8: It subjects to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Related Products
1.Water Treatment System (Water Filtration)
2.Bottle Blowing Machine (Making plastic bottles)
3.Air Conveyor (Transport empty bottles)
4.Water Filling Machine (Filling water into bottles)
5.Cap elevator (Transport cap)
6.Blow dryer (Blow dry water)
7.Flat Convey (Transport bottle)
8.Code Sprayer (Printing the date on the bottle water)
9.Labeling Machine (Labeling in bottled water)
10.Bottle Shrink Wrapping Machine (package the bottle water)
Address:
North of Xigang Village Committee, Jinfeng Town, Zhangjiagang, Suzhou, Jiangsu, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Manufacturing & Processing Machinery, Packaging & Printing
Company Introduction:
Jiangsu Fantas Industrial Technology Co., Ltd. is located in Zhangjiagang, a civilized city. Our factory was established in 2010 and has been committed to the development of domestic business. We are now expanding our international business. As an excellent supplier of beverage packaging machinery, we integrate R&D and manufacturing to provide turnkey solutions for beverage filling.
Since establishment, our company has always been positioned in the world′s most advanced beverage packaging machinery technology. We can provide customers with market positioning analysis, engineering budget design, equipment manufacturing, process configuration, personnel operation training and other services.
Our main products are automatic bottle cleaning, washing, filling, sealing, packaging and complete sets of production line for pure water, mineral water, soda water, fruit juice, yoghurt drinks, carbonates drinks, thick liquid food and wine. Also we can provide complete sets of barreled drinking water production line, complete sets of water treatment equipment and other auxiliary equipment.
Adhering to the concept of quality first and service first, our company provides customers with comprehensive services and efficient solutions.